Below are links to all of the forms needed to get a permit or comply with permit requirements. Are you sure you want to change this information. These resources include wetlands, rivers, streams, lakes, ponds, estuaries, coastal systems, springs, groundwater and surface water supplies. How satisfied are you with your experience today? Temporary/hydrant permits must be obtained in person. Fax: (831) 644-9560. Learn with instructional videos and user guides. Stormwater Industrial General Permits (IGP), (ARR16, ARG25, 50, 55, 64, 67, 75, 79, 87), Individual Discharge Permits(Treatment Facility Discharge), State Construction Permits(Treatment Facility Construction), Municipal Separate Storm Sewer System (MS4). For inquiries about permit documents, email Concentrated Animal Feeding Operations (CAFOs), Carriage and Interstitial Water from Dredging Operations, Contaminated Groundwater from Remedial Action Operations, Domestic Wastewater to a Subsurface Soil Absorption System, Hydrostatic Test Water and Water Supply System Water, Industrial Liquid Waste to a Subsurface Soil Absorption System, Landspreading of Industrial Liquid Wastes, Noncontact Cooling Water, or Condensate and Boiler Blowdown, Individual Permit Process for Municipal Wastewater Treatment Facilities, Individual Permit Process for Industrial Wastewater Treatment Facilities, Water withdrawal (>100,000 GPD or >70 GPM), Bridge - Municipal highway bridges, arches, culverts, Culvert - without professionally engineered design, Culvert - with professionally engineered design, Culvert - Municipal highway bridges, arches, culverts, Dredging - Invasive or non-native species management, Dredging - Installation of utility crossing(s), Dredging - Maintenance within a drainage district, Dredging - Maintenance of previously dredged area, Dredging - Riparian navigational dredging of man-made impoundments - Group or association, Dredging - Riparian navigational dredging of man-made impoundments - Individual, Dredging - Removal of plant or animal nuisance deposits, Habitat structure - Stream habitat projects designed by government agencies, Lake shore erosion control - Riprap repair, Lake shore erosion control - Riprap replacement, Lake shore erosion control - Seawall replacement, Lake shore erosion control - Seawall replacement with riprap, Municipal highway bridges, arches, culverts, Stream bank erosion control - Bio-stabilization, Stream bank erosion control - Integrated bank protection, Stream bank repair of riprap (placed prior to August 1, 2007), Stream bank erosion control - Replacement of structure with bio-stabilization, Stream bank erosion control - Replacement of structure with integrated bank treatment, Utility wetland, bridge, structure, dredging, driving on the bed, Wetland disturbance - Residential / industrial / commercial development, Wetland disturbance - Municipal highway bridges, arches, culverts, Wetland disturbance - Recreational development, Wetland disturbance - Dam maintenance, repair, reconstruction, Wetland - Established incidental to construction.

Find notices of a specific general permit: Most General NPDES Permits and General No-Discharge Permits may be completed and submitted online through the If a public hearing is requested and approved, a 30-day Division of Water Resources Well Permit dataset. View public notices of the DNR’s intention to authorize activity relating to water, including permits issued to the DNR. Enforcement analysts work closely with both representatives of permitted facilities and the public on a daily basis to keep the waters of Arkansas clean and safe for everyone to enjoy. mandatory review of some NPDES permits takes 30 days. Guidelines apply to the use and allocation of water resources in Queensland. The NPDES permit program is authorized by the federal Clean Water Act. Resources. Statutes Discharge permits are also called National Pollutant Discharge Elimination System (NPDES) permits. WATER PERMIT APPLICATIONS For some of our permits, submit applications and other forms to the DNR online.

What you need to include in your water permit - bore application. DEQ ePortal site. Corps of Engineers, the U.S. Licences are required, for example, to drill a bore, for taking and or interfering with the flow of water, and any large development works that use water. A note about commercial changes in use: Inspectors make unannounced visits to determine compliance at permitted facilities. A quick check with the District permit office staff will clarify whether a water permit is needed. Department of Heritage, and the Arkansas Game and Fish Commission. North Dakota State Water Commission | 900 East Boulevard Avenue | Bismarck, ND 58505 (main) 701.328.2750 | (fax) 701.328.3696 | 1-800-366-6888 or 711: TTY | E-mail For more information on this program or information on how to obtain a permit for a community garden, click on the image. permits involves less paperwork for the applicant. Guidelines apply to the use and allocation of water resources in Queensland. If you know the permit number, enter ONLY the permit … For inquiries about permit documents, email DEC.water.WQpermit@alaska.gov. The classes are free but, pre-registration is required. These permits are issued for activities that are prohibited from resulting in a waste being discharged to waters of the state. In working together with the Cleveland Department of Community Development, we have implemented a program to allow fire hydrant use for city-approved urban agriculture projects. Cleveland Water has provided affordable water access for community gardens in the Summer Sprout Program for years. Press Releases  •  §8-4-101 et. Some general permits require public notices or public review. Following the review, DEQ develops a draft permit Copyright © Monterey Peninsula Water Management District. Water permits are commonly needed for taking and using ground water for purposes such as irrigation. Detailed reports about well applications and permits with links to related imaged documents.

Contact  •  A list of Construction Storm Water Notices of Termination for ADEC issued NOIs.. A list of Large Cruise Ships Authorized to Discharge under the Wastewater General Permit 2013DB0004. e-Permitting for Chapter 105 General Permits, Water Obstructions and Encroachments.

Licences, permits, approvals for water use. Click on the image above for links to all of the forms needed to get a permit or comply with permit requirements. See which NOIs may be submitted electronically. The MPWMD office is closed in response to Monterey County’s Shelter in Place Order. Track the status of Wisconsin water permits. If there is no appeal, the permit becomes effective 30 days after the final decision is issued.

(Water Quality Standards for Surface Water), (Wastewater Treatment Plant Operators Licensing), (Disposal Permit for Real Estate Subdivisions), (National Pollutant Discharge Elimination System (NPDES)), (Permit Fee Regulations Management Rules), (Arkansas Underground Injection Control Code), Permit application process and timetable, public participation, and multi-agency review, The application process and public participation for general permits, Conceptual Closure Plan for C&H Hog Farms, 2017 EPA Clean Water Act Methods Update Rule for the Analysis of Effluent, DEQ Letter on the EPA Clean Water Act Methods Update Rule for the Analysis of Effluent, Instream 401 Certification & Short Term Activity Authorization, List of General Non-Stormwater NPDES Permits. An individual permit is developed for a specific facility and contains unique permit conditions and limits. Department of Environmental Conservation • Public Notices  •  Again, comment period precedes the public hearing. seq.) NPDES permits are required for facilities that release treated waste into waters of the state (creeks, streams, rivers or lakes). Coverage under general DEC.water.WQpermit@alaska.gov.

In both the discharge and no-discharge permit programs, permits are developed as either individual or general.

A non-permanent service connection requires a temporary/hydrant permit. Commercial & Multi-Family/Condo Common Area Efficiency Requirements, District Water Conservation and Rationing Plan, ELECTRONIC WATER PERMIT APPLICATION PROCESS FACT SHEET, ELECTRONIC APPLICATIONS FOR FIRE SUPPRESSION SYSTEMS, METER ENLARGEMENTS, METER SPLITS AND HYDRANT METERS, Table 2: Non-Residential Water Use Factors. This is accomplished by operational controls to prevent a discharge, land application, or sub-surface injection (underground injection control). Water permits, licences and fees. More detailed information about water bores and their construction. Drinking Water Permit Forms Having Trouble Opening These Forms? Compliance with Water Efficiency Requirements found in MPWMD Regulations XIV and XV are Conditions of Approval of a Water Permit. Cleveland Water | 1201 Lakeside Ave. | Cleveland, Ohio 44114 | (216)664-3130. Wastewater Regional Office Permit Search Enter information into the boxes below to search the Wastewater Regional Office Project Database for documents and/or plans associated with permits issued by the Regional Offices. User Guide Data Dictionary (Well Permits) Email the Webmaster, Alaska Department of Environmental Conservation.

North Dakota State Water Commission | 900 East Boulevard Avenue | Bismarck, ND 58505 (main) 701.328.2750 | (fax) 701.328.3696 | 1-800-366-6888 or 711: TTY | E-mail Please follow the instructions below to have your project reviewed by staff. Licences are required, for example, to drill a bore, for taking and or interfering with the flow of water, and any large development works that use water. This site is protected by reCAPTCHA and the Google

Water permit activities by category with options to start electronic or paper submittal process.